If the rate of labor use in Problem 91 is
g(x) = 2,000x,-1/3
and if the first 8 control units require 12,000 labor-hours, how many labor-hours, L(x), will be required for the first x control units? The first 27 control units?
DATE
Question answered on Jul 22, 2018
PRICE: $17
Solution~000637745.zip (18.37 KB)