If the TOL file cabinet has a gross material requirements plan as shown below, no inventory, and 2 weeks lead time is required for assembly, what are the order release dates and lot sizes when lot sizing is determined using lot-for-lot? Use a holding cost of $2.00 and a setup cost of $20.00, and assume no initial inventory.
DATE
Question answered on Jul 22, 2018
PRICE: $17
Solution~000637716.zip (18.37 KB)